In today’s competitive manufacturing landscape, timing is everything. For companies depending on fasteners, whether in construction, furniture production, home improvement, or OEM fabrication understanding and planning around delivery schedules can make or break a project.
Fong Prean, a leading screw and fastener manufacturer, offers a reliable and transparent timeline structure based on product category, complexity, and seasonality. This comprehensive article outlines what you can expect for standard screw products, custom-engineered designs, and specialty orders.
All lead times are estimates based on current production capacity and may vary depending on specific order requirements and production schedule availability.
Standard Products: 60-90 Days (Generally)
Standard construction screws require 60 to 90 days from purchase order confirmation to delivery.
Standard Product Categories:
- Drywall screws (M3.5 series)
- Framing screws
- Wood screws
- Chipboard screws
- Self-drilling screws
- Decking screws
- Fiber cement board screws
- Roofing screws
Production Breakdown:
- Order processing and production scheduling
- Raw material preparation
- Manufacturing (forming, threading, surface treatment)
- Quality control inspection and packaging
- Export documentation and shipping dispatch
Orders
Order process & production management.
Material
Raw material preparation.
Production
Go through heading, point and thread.
Quality
Final inspection and secure packaging.
Shipping
Prepare shipping document and container stuffing.
Custom Products: 90-120+ Days
Custom or specialized construction screws require 90 to 120+ days from order confirmation.
Custom Product Types:
- Non-standard sizes or specifications
- Special coatings or finishes
- Custom designs (head, thread, point)
- Private label packaging
Frequently Asked Questions About Lead Times
General Lead Time Questions
A1: Our minimum lead time is 60 days for standard construction screws. This reflects our quality manufacturing process and regularly cannot be shortened without compromising product quality.
A2:
We provide estimated delivery windows rather than guaranteed dates due to variables in manufacturing and shipping. However, we maintain proactive communication about any potential delays.
Custom Order Questions
A1: Custom orders require additional steps including tooling design, sample approval, specialized material sourcing, and custom processing setup. These steps are necessary to ensure your specific requirements are met.
A2: Custom order timelines have less flexibility due to engineering and tooling requirements. Some reduction may be possible if existing tooling can be used or if certain specifications can be standardized.
A3: Custom order timelines include all phases from tooling design through final delivery. Sample approval time depends on your response time, which can affect the overall schedule.
Communication and Tracking Schedule
- Purchase Order Confirmation - Order accepted and scheduled
- Material Readiness Notice - Raw materials prepared
- Production Start Alert - Manufacturing begins
- Production Completion - Manufacturing finished
- Quality Control Pass - Final inspection completed
- Estimated Time of Departure (ETD) - Shipping scheduled
Update Frequency
- Immediate notification of any delays or issues
- 48-hour advance notice of shipping
Contact Information for Lead Time Inquiries:
- Email: export3@ms.fongprean.com.tw
- Website: www.fongprean.com
All lead times are estimates based on current production capacity and may vary depending on specific order requirements and production schedule availability.